• Threads : ISO/R/7/1
• Working temperature : -20°C + 100°C
• Working pressure : PN 30 - DIN 8076
• Assembling instructions :
- Ensure to unscrew the nut from the fitting only of a few threads.
- Insert the tube, cutted vertically, into the fitting by pressure in order to reach the seat of the fitting itself.
- Tight up the nut completely.
Certifications :
• Acs 00 ACC NY 013